are you doing underwater LED lighting or are you talking in boat?
X
-
-
Senior Member of PLANETNAUTIQUE
- Feb 2010
- 921
- Phoenix AZ
- 2013 G23 550 hp (ordered and awaiting delivery) 2002 Super Sport (coverted into a SAN) 330 hp Excaliber 1994 Sun Tracker Party Barge 115 hp 1989 Horizon 200 Four Winns - sold 1989 Regal Commodore 280 - previous Possibly looking into picking up a 70'2-80's Nautique to rebuild as a ski boat
Have you received your boat yet? I have one that I ordered on tuesday (G23) and am hoping that they are still running ahead with production. How quickly was it done from the start (when you were informed I guess since the moulds are pre-made) to finish? How did they inform you, or did the dealer let you know?
Thanks, the anticipation is killing me. It is 90 degrees in AZ and the lake is 100% capacity (rare for the desert)Eric, Phoenix AZ
G23 550 hp (finally here)
2002 Super Air
1994 Sun Tracker Party Barge 115 hp
Comment
-
Got it last Saturday. It was done and at my dealer in late March but I've been traveling so couldn't pick it up. It takes them about 7 days to build a boat. Then some more time to ship - they try to consolidate and ship mutliple boats to reduce expenses so that can hold things up a little while. Your dealer should be able to tell you when it hits production.
Great to hear the AZ lakes are full after hearing/seeing so much news about drought conditions. I haven't even driven mine yet. Took it straight to stereo place. Replacing in boat speakers with wetsounds 6 1/2" (SD-4), replacing sub with XS-XXXvs (SD-2) and adding 2 pairs of Rev 10's (SD-2). Should be done in next week or two and by then, water will be warm enough for my wimpy family to get in. Looking forward to it.
Comment
-
They are running ahead of schedule !! Mine just got bumped up, its starts production tomorrow. Originally it was not suppose to start until the second week of may !! Should have it with in two weeks !!Originally posted by ers906 View PostHave you received your boat yet? I have one that I ordered on tuesday (G23) and am hoping that they are still running ahead with production. How quickly was it done from the start (when you were informed I guess since the moulds are pre-made) to finish? How did they inform you, or did the dealer let you know?
Thanks, the anticipation is killing me. It is 90 degrees in AZ and the lake is 100% capacity (rare for the desert)
Comment
-
Senior Member of PLANETNAUTIQUE
- Feb 2010
- 921
- Phoenix AZ
- 2013 G23 550 hp (ordered and awaiting delivery) 2002 Super Sport (coverted into a SAN) 330 hp Excaliber 1994 Sun Tracker Party Barge 115 hp 1989 Horizon 200 Four Winns - sold 1989 Regal Commodore 280 - previous Possibly looking into picking up a 70'2-80's Nautique to rebuild as a ski boat
Gate,
when did you place your order?Eric, Phoenix AZ